Pungrt Sports Hall
Optimizing lighting for greater energy efficiency: reduce consumption by up to 70%.
Client:
Municipality of Šmartno pri Litiji.
Project type:
Renovation of the entire lighting in the Pungrt Sports Hall.
Scope of cooperation:
Consulting, planning, installation.
Duration:
6 months.
Location:
Šmartno pri Litiji, SI.
Problem
The existing lighting was based on 51 HQL luminaires with a power of 400 W. These had long start-up times, high energy consumption, and no possibility of adjusting the luminance (cd/m²).
Main challenges:
- High electricity costs
- Poor user experience for different types of events
- Limited flexibility in adjusting lighting
Solution
Why H LUM
Conclusion
Luminaires used
- H LUM